ÖÐÎÄ | English | |
Shanghai: 021-63040008
SH Jiuxing: 021-64618320
Nanjing: 025-83357941
Hangzhou: 0571-81990171
Beijing: 010-67998477
Dalian: 0411-86874817
Tianjin: 022-26756760
Kunming: 0871-7163117
Nanning: 0771-3852969
Guangzhou: 020-36284098
Fuzhou: 0591-88072895
Wuhan: 027-88616401
Chengdu: 028-87623656
Xian: 029-62603771
Zhengzhou: 0371-66828630
Qingdao: 0532-81930136
Changchun: 0431-84853508
Product Name: | Injection Packer-8cm |
Injection Packer Long packer over 15cm is for loose structure; Construction of high-pressure Injection Waterproofing System Construction Prepares a. Find crack: For wet surface, first clean water; for dry surface, clean dust. Carefully looking for cracks, using colored pens or chalk mark along the cracks; b. Drilling: According to the thickness of concrete structures, from the crack of about 150 ~ 350mm, cross-drilled on both sides along the crack direction. 14mm diameter drill bit used. Holes and cracks in cross-section should be 45 degrees to 70 degrees cross, and the central cross in the bottom 1 / 2 range. c. Bury injection packers: buried with tools and fastening to ensure that the rubber part of the needle and the hole wall are dry before use, otherwise easily lead to slip when tightening. Construction Notes a. First, analysis cracks¡¯ width and length,take cores to determine the development of crack depth. b. If the surface is not easy dry, you can use torch drying, cracks due to moisture, can be found immediately to improve efficiency. Crack Repair a. Injection should be started in elevation from bottom to top, when the foam materil emerge from the cracks should immediately stop,and start again after a while. In the infusion process, if the material adjacent to the needle position has been filled, you can jump without injection. If found cracks extension in both ends or cracks with cross, should drill holes again, re-grouting . b. To fill cracks with polyurethane, should grout again before the material become solid. Notes when Grouting a. Stop infusing if polyurethane does not emitting from the cracks after 5 minutes. And try again later. If not yet filled, should check whether the buried pipeline cross-drilled or floor have holes and so on. b. Infusion should be closely watched gauge of work perfusion machine, if more than the rated pressure (45Mpa above), should be shut down, if pressure remained high, cracks should check whether the drilling cross with cracks. Detection of Crack Repair After complete of the cracks repair, testing with the core drilling. Test results should be the concrete surface smooth and dense, materials filled all the cracks in structure, and the compressive strength of concrete core samples meet the original design value. |