中文 | English

Shanghai:      021-63040008

SH Jiuxing:    021-64618320

Nanjing:         025-83357941

Hangzhou:   0571-81990171

Beijing:        010-67998477

Dalian:         0411-86874817

Tianjin:       022-26756760

Kunming:       0871-7163117

Nanning:      0771-3852969

Guangzhou:  020-36284098

Fuzhou:     0591-88072895

Wuhan:      027-88616401

Chengdu:    028-87623656

Xian:       029-62603771

Zhengzhou:  0371-66828630

Qingdao:    0532-81930136

Changchun:  0431-84853508

Injection Packer

Home >>Products >>Injection Packer
Product Name: Injection Packer-35cm

Injection Packer

 

Long packer over 15cm is for loose structure;
Short packer 8.5cm, 10cm for dense structures.
Other specifications can be customized.

 

 

Construction of high-pressure Injection Waterproofing System

 

Construction Prepares

a. Find crack: For wet surface, first clean water; for dry surface, clean dust. Carefully looking for cracks, using colored pens or chalk mark along the cracks;

b. Drilling: According to the thickness of concrete structures, from the crack of about 150 ~ 350mm, cross-drilled on both sides along the crack direction. 14mm diameter drill bit used. Holes and cracks in cross-section should be 45 degrees to 70 degrees cross, and the central cross in the bottom 1 / 2 range.

c. Bury injection packers: buried with tools and fastening to ensure that the rubber part of the needle and the hole wall are dry before use, otherwise easily lead to slip when tightening.

 

 

 

 

Construction Notes

a. First, analysis cracks’ width and length,take cores to determine the development of crack depth.

b. If the surface is not easy dry, you can use torch drying, cracks due to moisture, can be found immediately to improve efficiency.

 

 

Crack Repair

 a. Injection should be started in elevation from bottom to top, when the foam materil emerge from the cracks should immediately stop,and start again after a while. In the infusion process, if the material adjacent to the needle position has been filled, you can jump without injection. If found cracks extension in both ends or cracks with cross, should drill holes again, re-grouting .

b. To fill cracks with polyurethane, should grout again before the material become solid.

 

Notes when Grouting

a. Stop infusing if polyurethane does not emitting from the cracks after 5 minutes. And try again later. If not yet filled, should check whether the buried pipeline cross-drilled or floor have holes and so on.

b. Infusion should be closely watched gauge of work perfusion machine, if more than the rated pressure (45Mpa above), should be shut down, if pressure remained high, cracks should check whether the drilling cross with cracks.

 

Detection of Crack Repair

After complete of the cracks repair, testing with the core drilling. Test results should be the concrete surface smooth and dense, materials filled all the cracks in structure, and the compressive strength of concrete core samples meet the original design value.